COFCO Management Training Center

Dragon Spring Resort – near Beijing, China
HHCP Design International, Inc.

Project: Landscape Master Plan

Scope: Complete Design Guideline Manual

Duration: June 2006 - Present

Responsibilities:

  • Principle designer of master plan to detail for 13 unique gardens.
  • n Production coordinator and manager with production crew of four.
  • n Developing and producing comprehensive presentation drawings and renderings for Design Guideline Manual.
  • n HHCP overseas representative and project construction QC liaison.

Abu Dhabi International Airport and Midfield Competition*

Abu Dhabi, United Arab Emirates
HOK, Inc.

Project: $6.8 billion, 34 km², 53-gate new airport facility

Scope: Schematic Design Competition

Duration: October 2005

Responsibilities:

  • n One of three concept designers and interdisciplinary coordinator and manager with production crew of six.
  • n Developing and producing presentation drawings, renderings and a physical model per competition regulations and standards.
  • n Competition rule compliance and quality control manager.
* HOK received dual First Place Competition Award

New Doha International Airport and Public Mosque

Doha, Qatar
HOK, Inc.

Project: New construction: Multi-story 22-gate airside terminal, 100 room luxury hotel and Public Mosque.

Scope: Schematic Design – 100 percent Construction Documents

Duration: November 2004 – December 2005

Responsibilities:

  • Technical production team member co-lead and consultant liaison for all exterior curtain wall systems.
  • Developing and producing construction documents to the 1:5-scaled details of curtain wall-to-interior interfaces and floor/ceiling/structural transitions and connections.
  • Developed exterior elevations and coordinated all building sections for various discipline interfaces for Terminal portion.
  • n All discipline developer, coordinator and manager for Public Mosque package (a separate stand alone structure).

Rail-Trail National Design Competition*

Gainesville, FL
Luoni | Gold Design Studio

Project: Reclamation and conversion of a 2-mile abandoned railway line into an ecologically-sensitive, variable-use pedestrian and bicycle path system.

Scope: Schematic Design. 3 presentation boards for competition and public critique, and city counsel presentation of Rail-Trail Project.

Duration: May 2002 - August 2002

Responsibilities:

  • One of three lead designers and interdisciplinary coordinator with production crew of four
  • Primary AutoCAD document technician and archivist - A.I.A. standards
  • As-Built conditions coordinator
  • Historical facts/information/images administrator
  • Competition board presentation design principle
  • Project parameters assurance coordinator (city /code set back requirements)
* Received First Place National Award

Tampa International Airport -- Airside E

Delta Airlines Southeastern U.S. Hub Facility
Tampa , FL
HOK Aviation Inc.

Project: New construction. Multi-story 14-gate airside terminal and landside AGT passenger connector

Scope: Schematic Design - 100% Construction Documents

Duration: September 2000 - June 2001

Budget: $53 million

Responsibilities:

  • One of two lead designers and interdisciplinary coordinator with in-house production crew of six
  • Primary AutoCAD Contract Document production technician - A.I.A. standards
  • HOK - Client - Contractor liaison and team representative for $5 million AGT connector
  • Construction of two 3D working (physical) presentation models at 1:20 scale. One for contractor team-meeting use and one per clients request for public display and exhibition
  • Specifications coordinator for AGT and Interiors Package

Fort Lauderdale International Airport

Fort Lauderdale , FL
HOK Aviation Inc .

Project: Millwork Package (design-build track). Contract consisted of landside and airside airport operations millwork: Ticketing/Rent-A-Car/Baggage counters, FIDS, BIDS and telephone kiosks.

Scope: Schematic Design - 100% Construction Documents.

Duration: January 2000 - August 2000

Budget: $1.5 million

Responsibilities:

  • Lead designer and interdisciplinary coordinator with in-house production crew of two
  • AutoCAD Contract Document co-leader and production technician - A.I.A. standards
  • HOK production team meeting representative
  • HOK - Airline contact and coordinator of tenant build-out and equipment specification requirements

Orlando International Airport

South Terminal
Orlando , FL

HOK Aviation Inc.

Project: New construction. Multi-story 30-gate airside and landside facility to support existing airport

Scope: 100% Schematic Design (architectural shell)

Duration: August 1999 - December 1999

Budget: $ 240 million (estimated construction costs)

Responsibilities:

  • One of three design team members
  • AutoCAD Contract Document production team and Contract Document record archivist
  • Modeler for several study and presentation 3D working (physical) models at various scales
  • Contract Document production principal and Contract Document record archivist

Capital One Renaissance Centre and Campus*

Tampa , FL
Helmuth, Obata and Kassabaum Architects

Project: New construction (fast-track schedule). Multi-story credit card call center support facility, employee food court, internet café, and recreation center

Scope: Schematic Design - 100% Construction Documents

Duration: April 1998 - August 1999

Budget: $75 million

Responsibilities:

  • One of four design team members
  • AutoCAD technical and support team leader
  • Contract Document production principal
  • Full-time on-site construction administrator during construction phase
* Received 1998 A.I.A. National Award for design excellence

Muvico Theater - Pointe*21

Orlando , FL
HOK Studio E

Project: New construction (hyper-track schedule). 12-house stadium seating cinema and IMAX theater complex

Scope: Schematic Design - 100% Construction Documents

Duration: September 1996 - March 1998

Budget: $55 million

Responsibilities:

  • Project Architect full-time on-site representative
  • Sole liaison for HOK Studio E, P.C.L. Construction, Muvico, IMAX and P.O.D.C. to Orange County Building Department for code compliance and quality control
  • Liaison to Underwriter's Laboratories Testing Facilities in Northbrook, Illinois. Responsible for new UL design assembly for double-track head-to-ceiling 2-hour rated system-incorporated into UL's 1998 Assembly Design Manual
  • S.B.C.C.I. (1997 Southern Building Code) assembly occupancy code consultant for HOK Studio E
  • AutoCAD Contract Document production administrator for all disciplines (A.I.M.E.&P.)